Simplification · CRMAB-PRM-09Hold the permitting time limits where the project's nature, complexity, location or size requires longer -- six months more for extraction, three for processing or recycling.
Promoters of Strategic Projects must comply, and this is law in force.
Why it matters
This is law in force, not a proposal.
- It is Art. 11(4), in the Critical Raw Materials Act. as of 2026-08-18
- The act gives its timing as: From entry into force, 23 May 2024 (Art. 49(1)). as of 2026-08-18
- It names 3 industries by name: Waste, Aluminium and Steel. as of 2026-08-18
- Compliance is checked by competent authority, if it happens. as of 2026-08-18
The rule
New — no predecessor
Trigger
an exceptional case turning on nature, complexity, location or size
Obligation
Hold the permitting time limits where the project's nature, complexity, location or size requires longer -- six months more for extraction, three for processing or recycling.
Who is affected
Addressee
Promoters of Strategic Projects
Class
Businesses
Sectors
Names Waste and landfill, Aluminium and metals, Steel
Applies
From entry into force, 23 May 2024 (Art. 49(1))
Burden drivers
No burden drivers recorded on this provision.
Source text
Verbatim
Member States may extend, before their expiry and on a case-by-case basis, the time limits referred to in: (a) paragraph 1, point (a), and paragraph 2, point (a), by a maximum of six months; (b) paragraph 1, point (b), and paragraph 2, point (b), by a maximum of three months.