Requirement · LM-18aGive each net-zero technology pre-qualification/award criterion a minimum weight of 5% and a combined weight of 15-30% of the auction's award criteria.
Member States designing net-zero technology auctions must comply, and this is not law yet.
Why it matters
This is a Commission proposal: it is not law yet, and it can change before it is.
- It is Art. 34(5)(e) (amended Art. 26(4) of Regulation (EU) 2024/1735), in the Industrial Accelerator Act. as of 2026-08-17
- The act gives its timing as: From entry into force. as of 2026-08-17
- It names 3 industries by name: Batteries and solar, Clean tech and Power. as of 2026-08-17
- Compliance is checked by none, per auction. as of 2026-08-17
The rule
New — no predecessor
Trigger
Auctions with net-zero technologies as part of the subject matter
Obligation
Give each net-zero technology pre-qualification/award criterion a minimum weight of 5% and a combined weight of 15-30% of the auction's award criteria.
Who is affected
Addressee
Member States designing net-zero technology auctions
Class
Governments
Sectors
Names Batteries and solar, Wind, heat pumps, hydrogen, Power and heat
Applies
From entry into force
Burden drivers
D1 — 1 of 7 marks fire on this provision.
Source text
Verbatim
e) paragraph 4 is replaced by the following: ‘4. Member States shall give to each of the criteria referred to in paragraphs 2 and 2a, when applied as award criteria, a minimum weight of 5 % and a combined weight of between 15 % and 30 % of the award criteria